Crane Industry Experts was brought in during a scheduled power plant outage to support critical well system maintenance. With high-stakes timing and strict safety requirements, our NCCCO-Certified Rigger II led lift planning, execution, and coordination to ensure every phase was completed safely and without delay.
The Solution
Our Rigger II provided full oversight of all rigging and lifting operations—from pre-lift inspections to personnel and equipment hoisting. This expert guidance ensured OSHA/ASME compliance, minimized downtime, and kept every lift running smoothly under outage constraints.
Phase 1: Rigging & Lift Coordination
Our certified Rigger II conducted a full jobsite assessment to evaluate:
-
Load weights and center of gravity
-
Lift path and equipment selection
-
Rigging components per OSHA/ASME standards
-
Pre-lift inspections and contingency planning
Phase 2: Personnel Lifting
Using a secured personnel platform, our team provided safe access into confined well areas for routine inspection and repairs—maintaining 100% fall protection compliance.
Phase 3: Pipe & Equipment Lifting
Our expert rigger supervised the lifting of:
-
Pipes, pumps, and valves
-
Maintenance tools and materials
-
Large well system components
All while adjusting rigging configurations in real-time to meet evolving jobsite needs.
Our Values Make A Difference
Safety isn’t just a standard — it’s our promise.
Transparent communication from bid to final lift.
On-site leadership that keeps projects moving.
Every job is a partnership built on trust.
Results
The Outcome In Numbers & Impact
✅ Pre-lift planning reduced unnecessary downtime
✅ Zero lifting incidents during the entire outage
✅ Safe, compliant access for maintenance personnel
✅ All lifts completed on schedule and under supervision
- Safety Compliance Rate 100%
- Schedule Adherence 96%
- Rigging Precision 98%
- Team Coordination 94%